Design Division is working on a plan to improve the streetscape and waterfront walkway along Murray Boulevard (the Low Battery) in conjunction with the replacement and raising of the seawall to prevent tidal flooding. We believe that shared-lane arrows, and mixing of bicycle and automobile traffic in the travel lanes is sufficient to accommodate bicycle travel along this corridor. Automobile speeds are already slow, which will be slowed even further with planned traffic calming measures and pedestrian-oriented streetscape design.

Posted
AuthorAllen Davis